With a very short timeframe on this job, we arrived with site still trading on the Sunday and had it reopened and trading again the following Monday morning. Works included the installation of a 30KL above ground diesel tank with remote fill point as the tank was positioned at the back of the property. Removal of 3 old Electrolines and installation of 2x refurbished 6 hose PEC 9000 pumps. We converted the old Diesel tank to a ULP tank to increase the ULP capacity at the site and also completely upgraded the electrical system. The works that we have completed at this site has dramatically increased sales volume for the customer.
EMI Line location
Concrete cutting and removal
Remote fill box and line installation
Line reconfiguration
Pump sump installation
DSL to motorspirit tank conversion
Line replacement
Supply of refurbished 6 hose pumps
Pump calibrations and site commissioning
Challenges
The main challenges on the project were a short timeframe and a tight budget to work with. By supplying refurbished pumps, we were able to save a lot of costs there. With very precise planning and coordination we managed to get this project completed to high standard and back trading again serving customers within 7 days. All while keeping the project on budget.