With a very short timeframe on this job, we arrived with site still trading on the Sunday and had it reopened and trading again the following Monday morning. Works included the installation of a 30KL above ground diesel tank with remote fill point as the tank was positioned at the back of the property. Removal of 3 old Electrolines and installation of 2x refurbished 6 hose PEC 9000 pumps. We converted the old Diesel tank to a ULP tank to increase the ULP capacity at the site and also completely upgraded the electrical system. The works that we have completed at this site has dramatically increased sales volume for the customer.

EMI Line location 

Concrete cutting and removal

Remote fill box and line installation 

Line reconfiguration 

Pump sump installation

DSL to motorspirit tank conversion 

Line replacement

Supply of refurbished 6 hose pumps

Pump calibrations and site commissioning 

Challenges

The main challenges on the project were a short timeframe and a tight budget to work with. By supplying refurbished pumps, we were able to save a lot of costs there. With very precise planning and coordination we managed to get this project completed to high standard and back trading again serving customers within 7 days. All while keeping the project on budget.

PROJECT

Bestway Petroleum

CLIENT

Deni Petroleum

SERVICE FOCUS

Site upgrade and storage capacity increase.

LOCATION

Deniliquin, NSW, Australia

YEAR BUILT

2023

GALLERY

FoxFuels in Action