On this project the customer was supplying their own pumps that they had sourced 2nd hand from another site. The team refurbished these pumps on site to get them back to good operating and compliant condition. We have also future proofed this site by configuring the pipework to allow for an additional above ground diesel tank to be incorporated seamlessly into the system in the near future, as sales volume increases and additional capacity is required. we Have also replaced and extended the forecourt at this site to provide a better customer experience while refuelling. As with all of our site upgrade projects we leave the site fully operational.
Project Details
EMI Line location
Concrete cutting
Electrical system upgrade
Excavations
Concreting
Console and communications upgrade
Line replacements
Pump refurbishment
Calibration (NMI certifiied)
Challenges
As we were using second-hand pumps of unknown condition, supplied by the customer, we had to be prepared for all scenarios in regards to issues with these pumps.The team was able to refurbish these pumps on site, test and rectify any issues on the spot, so that there is minimal issues on commissioning day.